c)
recommended to take the right amount of modules according to the progress of the project
every day. Due to the modules piling on the ground after unpacking, in case of heavy rain
and other inclement weather which has the potential risk to be a long soak in water can
affect product reliability, such as typhoons and other modules in case of inclement weather
is not installed which may be torn away. If the users need to store modules before
installation, do not open the package, the goods should be stored in a room temperature,
dark, dry and ventilated place.
1.3.2 Module Stack
a) When a module is taken out of the box, cardboard bedding below should be applied, in
order to avoid contacting cement surface / ground hard metal or steel tile shocked collision
friction scratch.
b) When stacking modules, it needs to be stacked neatly in the horizontal plane, under the
condition of the glass facing down and the back way piled up, while the cardboard bedding
need to be underside the modules. If the modules will be installed on the rooftop, the
number of each stack is suggested no more than 20. In case of the poor load-bearing
process, the installation tools and other objects are avoided to be on the module surface.
c) If the modules are requested to be classified by current, the handling personnel are required
to carry out of the level of the current and make a mark separately according to the power
on the list. (e.g. 275W-L, identifies the modules of the packaging according to the power on
the list, indicating a low current position; 275W-H, compared to high current position).
Usually, the same series of modules in the same current position are required in
accordance with the system design requirements.
d) If the modules are color-coded and marked the corresponding logo on the carton due to the
customer requirements, when modules are taken out and stacked, they should be labeled to
avoid confusion. Usually the same row or the same square have the same color according
to the system design requirements.
e) Due to the complexity and difference of the construction site, these precautions may not
cover all items, please refer to the specific construction standards.