Aleo P23 Installationshandbuch - Seite 16

Blättern Sie online oder laden Sie pdf Installationshandbuch für Kontrolleinheit Aleo P23 herunter. Aleo P23 20 Seiten.
Auch für Aleo P23: Installationshandbuch (20 seiten)

Aleo P23 Installationshandbuch
10.7.3 Module P23
0 mm
300 mm
220 mm
Fig. 11
Mounting P23 with clamps
Clamping
220 mm – 458 mm
long side
220 mm – 300 mm
Clamping
short side
Table mounting areas clamping for
Load level
Lay-in system
Load level I
long side
Table lay-in system for P23
*
Based on IEC 61215
aleo solar GmbH | Marius-Eriksen-Straße 1 | 17291 Prenzlau | Germany |
458 mm
Clamping area
0 mm – 458 mm
Load level I
Load level II
Load level III
0 mm – 200 mm
Load level I
P23
Permissible pressure
(test load)
2400 Pa
Modules can be mounted horizontally
and vertically.
Please note the information on snow
load in section 10.6.4.
Permissible pressure
Load level
(test load)
1400 Pa
3900 Pa
5400 Pa
1400 Pa
Permissible suction
(test load)
2400 Pa
Installation manual Ver. 4.8, 05/2021, en
Permissible suction
(test load)
*
1400 Pa
2400 Pa
2400 Pa
1400 Pa
*
Page 16 of 20