AUSTART ATS83-2 Handbuch für Installation und Wartung - Seite 4
Blättern Sie online oder laden Sie pdf Handbuch für Installation und Wartung für Controller AUSTART ATS83-2 herunter. AUSTART ATS83-2 16 Seiten. Turbine starter
INSTALLATION AND PREPARATION FOR OPERATION
Maximum pressure for AUSTART starting
equipment is 150psi (standard operating
pressure is 100psi).
Ensure
air
supply
installation,
removal,
adjustment of your AUSTART starter.
Before any starter is taken out of service
first bleed the air receiver of air and any
moisture that may have accumulated by
opening up the drain valve. Do not bleed
by removing the receiver plugs.
Remove air hoses to ensure complete
safety once the air supply has been
isolated and the receiver has been bled.
The air receiver must be manufactured to
an applicable pressure vessel code such
as AS1210 or similar.
Only use air hoses and fittings that are of
adequate
size
installation schematic (page 6).
PRELIMINARY INSTALLATION REQUIREMENTS
Numbers in brackets refer to items numbers on Exploded View drawing on page 8.
1. Your AUSTART Starter is flange mounted.
Before installing the starter carefully study
the mating position of the AUSTART starter
and engine flanges to determine whether
the air inlet port orientation or nose
housing
(44)
geometry
particular installation.
orientate as follows -
Carefully loosen the band clamp (8) but
do not remove. The two housings can
now be rotated independent of each
other without separation.
Re-orientate the housings to the desired
position and torque the band clamp (8)
to 4ft lb (6 Nm).
2. Ensure
pinion
application ie correct pitch, diameter and
number of teeth.
3. Check flange to ring gear (FRG) spacing is
correct and that flange spacers are not
is
isolated
before
maintenance
as
indicated
in
will
suit
If not suitable re-
is
suitable
for
engine
WARNING
!
Always carry out a pressure test on the
complete starting system according to
Clause 8 on Page 5 before beginning
operation. Do not begin operations until
satisfied
or
correctly.
Do not initiate a start until all components
have stopped rotating, this includes the
engine and starter motor.
Always
where prescribed by this manual. Under
no
circumstances
volatile liquids.
Ensure all fasteners are torqued to the
values prescribed in this manual.
thread sealant where indicated.
To ensure warranty provisions are not
invalidated use only genuine AUSTART
replacement parts.
the
may cause service and performance
problems
operation of your starter.
required. Pinion should be FRG less 1/8"
(3mm) when at rest.
4. Check AUSTART starter clears all obstacles
and the flange mounts to flywheel housing
your
squarely without using undue force.
5. Ensure the hoses, fittings and starter ports
are clean and free from dirt and foreign
objects. Ensure they remain so during
installation.
6. For optimum AUSTART starter performance,
ensure air supply pipes or hoses have an
internal diameter of at least 1" (25mm)
refer Installation Schematic on page 6. If
the main supply line length is greater than
15ft (5m) a size of 1-1/2" (40mm) should be
used. Keep the number of fittings and the
length of piping to a minimum. Avoid the
use of reducing bushes and other fittings
that could impede air flow.
4
the
unit
has
been
use
recommended
use
flammable
Non-genuine parts
and
may
affect
installed
lubricants
or
Use
the
safe