AUSTRIAN GAMING INDUSTRIES NOVOSUPERVISION FV-626 CF2 Handbuch - Seite 16

Blättern Sie online oder laden Sie pdf Handbuch für Videospiel-Zubehör AUSTRIAN GAMING INDUSTRIES NOVOSUPERVISION FV-626 CF2 herunter. AUSTRIAN GAMING INDUSTRIES NOVOSUPERVISION FV-626 CF2 20 Seiten. Kernel 8.2

3
P O W E R U P
P O W E R U P
3.3

Power up

1)
Before start check the line voltage. The machine has been designed to sustain 230 V ± 10 %, 50 Hz
or 110 V ± 10 %, 60 Hz. Make sure that the line voltage corresponds to the voltage indicated on the
machine.
2)
As all machines of the NOVOSUPERVISION™ Series are equipped with an earthing connection, it
should be ensured that the main supply is also equipped with an earthing connection.
3)
Plug in the main plug correctly.
4)
Open the main door.
5)
If the machine is equipped with a coin comparitor, place the reference coin in there.
6)
Refill the hopper.
Illustr. 3-2
Main switch
7)
Switch on the machine.
8)
After the machine has been powered up, the major parts of the machine (e.g. hopper, CPU board, bill
acceptor. coin acceptor, etc.) are subject to a self test. If this test has been successful, the machine
switches automatically to the ready-for-play status.
The error management engages each malfunction and/or manipulation is detected.
If the machine detects an error, the corresponding code is shown on the screen.
Illustr. 3-3
Error display
Error handling (procedures to rectify an error):
- Turn the attendant key.
- Clear the error.
- Release the attendant key.
- Usually the machine should now be ready for operation again.
9)
Close the main door.
10)
After a short self test the machine is ready for operation. Credits can be added and a new game can be
started.
1 6
F_626CF2_Schaltermodul.jpg
45M626U1DE-02
Main switch
S_Fehleranzeige_UK.eps
© 09 2008 AGI GmbH