Great Little Trading L4471 Schnellstart-Handbuch - Seite 7

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Inneneinrichtung Great Little Trading L4471 herunter. Great Little Trading L4471 9 Seiten. Alba corner shelf unit

Great Little Trading L4471 Schnellstart-Handbuch
STEP 4:
Lay back support panel I flat on the floor. The large drill holes on the panel
to be facing the floor and the small pilot holes on the edge MUST be facing
outwards.
Take the joined G/H shelf panels and insert 2x wooden dowels (#2) into the
holes in the corner.
Connect the shelf panel with panel I.
Now take back support panel J and position with the drill holes facing
outwards. Push onto the dowel of G/H. It will sit on the top of panel I.
G
#2
I
BASE
TOP
Hardware for Step 4:
2x #2 Wooden Dowels
H
#2
#2
J
It is important that these small pilot
holes are visible and in this position on
panel I, as they are needed in a later step.
Hardware for Step 5:
8x #2 Wooden Dowels
2x #3 Cam Locks
E
BASE
#2 x4
STEP 5:
Take the C/D top panels and insert 4x wooden dowels (#2) into the
remaining holes in the corner.
Push into the drill holes on the edges of panels I & J.
Insert 1x cam lock (#3) in the large hole on panel J and turn clockwise to
lock.
Take the E/F base panels and insert 4x wooden dowels into the remaining
holes in the corner.
Now push this onto the back support panels I & J.
Insert 1x cam lock in the large hole on panel J and turn clockwise to lock.
NOTE: The cam locks on panel I will be secured at a later stage.
7
D
C
H
G
F
#2 x4
#3
#2 x4
J
#3
#3
TOP