AFL Hyperscale 6RU Installationshandbuch - Seite 6

Blättern Sie online oder laden Sie pdf Installationshandbuch für Netzwerk-Hardware AFL Hyperscale 6RU herunter. AFL Hyperscale 6RU 16 Seiten. Front-access v-panel
Auch für AFL Hyperscale 6RU: Installationshandbuch (12 seiten), Installationshandbuch (20 seiten)

AFL Hyperscale 6RU Installationshandbuch
Unpacking the Panel
Remove the shipping bracket xing bolts
3.
(QTY x 4) using 13mm socket wrench and
screwdriver.
Using 13mm socket wrench or spanner, remove
5.
shipping bracket bolts (QTY X 6 per side).
6
© AFL Hyperscale. All rights reserved
Using handles, lift panel out of shipping crate.
4.
Weight: approx. 25kg (55lbs) - TAKE CARE
WHEN LIFTING.
Push black lever to detach slide rail
6.
Starting from top to bottom, slide out and de-
latch rail, and set aside to splice one at a time.
Series