AFRISO PrimoBox ACB 910 Betriebs- und Installationshandbuch - Seite 12

Blättern Sie online oder laden Sie pdf Betriebs- und Installationshandbuch für Kesselbedarf AFRISO PrimoBox ACB 910 herunter. AFRISO PrimoBox ACB 910 20 Seiten. Mixing unit for condensing boilers

Instruction manual

4.2 Available pressure chart

Fig. 6: Diagram of available pressure on the low temperature zone

5 Transport and storage

ATTENTION
ATTENTION
12
Possibility of damage to the device during improper transport.
Do not throw the device.
Protect against water, moisture, dirt and dust.
Possibility of damage during incorrect storage.
Store the device in a dry and clean room.
Protect against water, moisture, dirt and dust.
PrimoBox ACB 910 mixing unit for condensing boilers