Align-Pilates M2-Pro Reformer Montageanleitung & Benutzerhandbuch - Seite 2

Blättern Sie online oder laden Sie pdf Montageanleitung & Benutzerhandbuch für Fitnessgeräte Align-Pilates M2-Pro Reformer herunter. Align-Pilates M2-Pro Reformer 12 Seiten. Reformer

Introduction
Thank you for purchasing our M2-Pro reformer, crafted from solid North American maple; classical styling
with contemporary functionality. Designed for studio, rehab or private use, with our innovative design
offering a host of easy adjustments to provide complete flexibility in use. This manual will show you how to
build each variant of the M2-Pro reformer. Please ensure you read it fully before
unpacking and assembling the equipment.
Specification & Adjustability
• 104cm of smooth silent travel from the 8 PU wheel system
• Widest carriage on the market for greater comfort
• 4 spring bar positions with easy adjustment system
• Locking footbar with 4 positions including completely flat
• Quick and safe simultaneous rope adjustment system
• Patented silent pulleys with silent design ropes & double loop handles
• Silent foot strap with fluffy
• 150kg maximum user weight
Dimensions:
• Reformer only: 249cm x 76cm (at maximum dimensions)
• Weight: 80kg
Assembly
When using this manual if you are not sure which part the instructions are referring to please see the reformer map on
page 7 and the M2 Pro explored on page 10.
Warning: the main box for the M2-Pro reformer weighs around 85kg so at least two strong people are required to
unpack the equipment and correct lifting technique should be used. At all times you are responsible for your own
safety and those around you.
Please unpack the equipment in a clear, clean & dry environment on a level floor surface.
Unpacking the main outer box:
a. Carefully cut the bag using scissors & with one person at each end lift the reformer out.
b. Remove the two accessory boxes and the bolt pack, see Fig.2, and move the large shipping carton out of the
way (we suggest you do not dispose of it until you are happy with the complete install) .
c. Open Box 1 which contains the footbar components. Remove all outer packaging from the components and
discard the packaging.
2
Box 1
Bolt Pack
Fig.1
Box 2
Fig.2