Kohler Stillness K-14456 Installationshandbuch - Seite 4
Blättern Sie online oder laden Sie pdf Installationshandbuch für Armaturen für das Badezimmer Kohler Stillness K-14456 herunter. Kohler Stillness K-14456 32 Seiten. Accessories
Auch für Kohler Stillness K-14456: Handbuch für Hausbesitzer (21 seiten), Installationshandbuch (20 seiten)
2. Prepare the Site — Wall Plate(s)
Determine the desired mounting location.
Mark the vertical and horizontal center lines for the accessory to
be installed. Consult the roughing-in diagrams to determine the
dimensions.
When installing multiple-post accessories, measure the accessories
so you can provide the required distance between the center
points.
Use a level to ensure that all center points are level.
3. Mark and Drill the Pilot Holes
Mark the pilot hole locations vertically 15/32" (1.1cm) above and
below the center point or center points.
Vertically align the holes on each wall plate. Make sure the larger
hole is oriented as shown in the illustration.
If the installation requires multiple posts, confirm that the center
points are even using a level.
NOTE: There is no provision for later adjustment if the center points
and resulting pilot holes for multiple post accessories are not level.
Select a drill and 5/16" drill bit that are appropriate for the wall
material you will be drilling through.
Carefully drill a 5/16" hole at all marked pilot hole locations.
1013267-2-C
4
Kohler Co.