Dell S4048T-ON Handbuch "Erste Schritte - Seite 13
Blättern Sie online oder laden Sie pdf Handbuch "Erste Schritte für Schalter Dell S4048T-ON herunter. Dell S4048T-ON 35 Seiten.
Two-post flush-mount configuration
NOTE:
Your system is not NEBS Earthquake Z4-compliant if you use this installation
method.
1
For this configuration, remove the latch castings from the front side of each ReadyRails
assembly, item 1.
To remove the two screws and latch casting from each front flange ear, on the switch
side of the rail, use a Torx driver. Retain the castings for future rack requirements. It is
not necessary to remove the rear flange castings.
2
Attach one rail to the front post flange with two user-supplied screws, item 2.
3
Slide the plunger bracket forward against the vertical post and secure the plunger
bracket to the post flange with two user-supplied screws, item 3.
4
Repeat this procedure for the second rail.
Hardware installation
13