Miele PW 6163 EL/D Installationsplan - Seite 11
Blättern Sie online oder laden Sie pdf Installationsplan für Waschmaschine Miele PW 6163 EL/D herunter. Miele PW 6163 EL/D 16 Seiten.
Cold water
Max. temperature
(Soft water)
Min. flow pressure
Max. pressure
Volume flow necessary
Special version, unit without detergent dispenser.
On-site connection thread according to DIN 44 991
Length of connection hose
(supplied: 1 connection hose)
Water requirements with standard connection to hot
water in 60°C programme ( average value)
In absence of hot water supply, connect hose to cold
water supply!
Cold water
Min. flow pressure
(Hard water)
Max. pressure
Volume flow necessary
On-site connection thread according to DIN 44 991
Length of connection hose
(supplied: 2 connection hoses + Y piece)
Water requirements with standard connection to hot
water in 60°C programme ( average value)
In absence of hard water supply, connect hose to cold
water supply!
Cold water
Min. flow pressure
Liquid
Max. pressure
dispensing
On-site connection thread according to DIN 44 991
(Optional)
Length of connection hose
(supplied) 1 connection hose)
Drainage via
Max. temperature
dump valve
Machine-side drain connection (ext. diameter)
On-site drain (int. diameter)
Max. transient throughput
Vented manifold required.
Drain manifolds serving several machines must be of
sufficient cross-section.
Machine vent
Machine-side connection for Miele vapour and foam
venting kit.
Machine-side
On-site vapour vent for connection to Miele vapour
MEL
vent line
and foam venting kit or additional fan.
Equipotential
Connection with male thread
bonding
with washers and nut.
If necessary, equipotential bonding with good
galvanic contact
must be provided in accordance with all appropriate
national and local regulations.
Fittings
Without plinth
(supplied)
4 × screws DIN 571 (Ø × length)
4 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be
provided on site.
Miele plinth / Weighing system plinth
4 × screws DIN 571 (Ø × length)
4 × rawl plugs (Ø × length)
Machine must be bolted to the floor!
Fixing materials for a floating screed floor are to be
provided on site.
Installationsplan / Installation plan: PW 6163 EL/D
Datum / Date: 16.03.2011
Volume flow necessary
°C
70
kPa
100
kPa
1000
l/min
16
l/min
20
Inch
¾" external thread
mm
1500
l/h
not yet available
kPa
100
kPa
1000
l/min
32
Inch
1" external thread
mm
1500
l/h
not yet available
kPa
100
kPa
1000
Inch
¾" external thread
mm
1500
°C
95
mm
75 [DN 70]
mm
75 [DN 70
connection]
l/min
200
mm
10 × 35
M
10
mm
12 × 90
mm
16 × 80
mm
12 × 90
mm
16 × 80
Seite / Page: 11