Ricoh Pro C900s Installationshandbuch - Seite 15
Blättern Sie online oder laden Sie pdf Installationshandbuch für Drucker Ricoh Pro C900s herunter. Ricoh Pro C900s 24 Seiten. Color server options
Auch für Ricoh Pro C900s: Spezifikationen (6 seiten), Merkmale Handbuch (27 seiten), Broschüre & Specs (8 seiten), Hinweise für Benutzer (2 seiten), User Addendum (24 seiten), Handbuch mit Sicherheitsinformationen (12 seiten)
Note: When installing the SR5000, booklet finisher, cover interposer and
Z-fold, check RTB RG178020 Option Firmware Update PDF for the correct
Z-Fold EPROM and firmware versions. Please use the following link to
download the RTB, Technical Website/ Documents/ Pro C900 - Pro C900s
/ Installation Documents section;
20. Fit all hardware modification parts that are required to the
21. Fit all decals and badges.
22. Turn the machine on and print the PS Test page. Keep the PS Test
Stage 2: Transporting the machine
The following information details important notes on the moving of the
machine.
Review the site survey report (performed by a service representative in
the pre-sales process) and inform the transport company of any site
related issues.
•
•
•
Colour High Volume Production System - Installation Guide
Pro C900
Note: The Ring Binder and Perfect Binder peripherals have
multiple firmware modules. These peripherals require all their
firmware modules to be selected simultaneously.
http://partners.ricoh.com.au/web/aubase/technical/documents.nsf
/allbymodel/94D8EB5828119049CA2575D0008274B9?OpenDocum
ent
mainframe and peripherals.
page for the print quality check procedure that will be performed
as part of Step 3, on-site installation.
Turn off the mainframe and remove the fusing unit. This will need
to be transported separately to the mainframe. Please inform the
transport company to keep the fusing unit level during
transportation to the customer's site.
There have been a couple cases reported where the transport
company have strapped the machine to the side of the truck with
the front of the machine facing out. As the straps have been
tightened the front doors and hinges have been damaged. To
prevent this from occurring instruct the transport companies to
strap the machines to the side of the truck with the rear of the
machine facing out.
Some installations will require the removal of the rear controller
box or Fiery controller to enable the machine to be moved into the
customer's site. Please ensure that the procedure in the service
manual is followed step by step. Incorrect positioning of IPU Board
connectors when reinstalling the rear controller box back onto the
mainframe can lead to several issues.
For more details download RTB RG178032, Technical Website/
Documents/ Pro C900 - Pro C900s / Installation. Please use the
following link to download the RTB;
http://partners.ricoh.com.au/web/aubase/technical/documents.nsf
/allbymodel/D6C46395ECECD47ECA2575D00082ABBF?OpenDocu
ment
Page 15 of 24