ABB ACQ80-01 Kurzanleitung für Installation und Inbetriebnahme - Seite 2
Blättern Sie online oder laden Sie pdf Kurzanleitung für Installation und Inbetriebnahme für DC-Antriebe ABB ACQ80-01 herunter. ABB ACQ80-01 14 Seiten.
R4
3
4. Examine the installation site
Examine the site where you will install the drive. Make sure that:
•
The installation site is sufficiently ventilated or cooled to remove heat from the drive.
•
The ambient conditions meet the requirements. Refer to
•
The installation surface is as close to vertical as possible and strong enough to support the weight of the drive. For the
Weights and free space requirements
weights, refer to
•
The installation surface, floor and materials near the drive are not flammable.
•
There is sufficient free space around the drive for cooling, maintenance, and operation. For the minimum free space
Weights and free space requirements
requirements, refer to
•
There are no sources of strong magnetic fields such as high-current single-core conductors or contactor coils near the
drive. A strong magnetic field can cause interference or inaccuracy in the operation of the drive.
5. Install the drive on the wall
Select fasteners that comply with local requirements applicable to wall surface materials, drive weight and application.
Prepare the installation site
1.
Make marks with the help of the mounting template. Remove the mounting template before you install the drive on the
wall.
2.
Drill the holes and put anchors or plugs into the holes.
3.
Install the screws. Leave a gap between the screw head and mounting surface.
R4
a
1
a
b
c
d >
e >
R5
3
× 2
× 4
R5
1
c
× 4
R4
mm
160
619
-
-
-
× 2
Ambient conditions
.
.
.
× 2
× 4
in
6.30
24.37
-
-
-
R4 and R5
R4 and R5: M6
2
R5
mm
612
24.09
581
22.87
160
6.30
200
7.87
100
3.94
2
in