Cisco SCE 1000 and Schnellstart-Handbuch - Seite 2

Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Netzwerk-Hardware Cisco SCE 1000 and herunter. Cisco SCE 1000 and 49 Seiten. Service control engine 1000 2xgbe

Cisco SCE 1000 and Schnellstart-Handbuch
Revised: June 13, 2011, OL-24144-01
This document supports all 3.7.x releases.
Note
1

Prepare for Installation

This section contains warnings, information about tools and parts, site preparation information, and information for
workbench or tabletop installation and rack-mount installation.
Warning
This warning symbol means danger. You are in a situation that could cause bodily injury. Before you work on any
equipment, be aware of the hazards involved with electrical circuitry and be familiar with standard practices for
preventing accidents. To see translations of the warnings that appear in this publication, refer to the translated
safety warnings that accompanied this device.
Only trained and qualified personnel should install, replace, or service this equipment.
Read the installation instructions before you connect the system to its power source.
This unit is intended for installation in restricted access areas. A restricted access area is where access can only be gained by
service personnel through the use of a special tool, lock and key, or other means of security, and is controlled by the authority
responsible for the location.
Voltage is present on the backplane when the system is operating. To reduce risk of an electric shock, keep hands and fingers
out of the power supply bays and backplane areas.
Do not work on the system or connect or disconnect cables during periods of lightning activity.
Before beginning the installation of the SCE 1000, read the
Control Engines (SCE)
document.

Information About Preparing for Installation

• Site Preparation and Unpacking, page 2
• Tools and Parts, page 2
• Prepare for Rack-Mount Installation, page 3

Site Preparation and Unpacking

• Lift the SCE 1000 platform safely out of the packing container.
• Ensure the power service at the site is suitable for the SCE 1000 platform.
• Check the packing slip to ensure that all the proper components are present.
• Locate and have accessible the Site Log for recording information about this installation.

Tools and Parts

Use the following list of tools and parts as a checklist for preparing for installing the SCE 1000 platform:
• Appropriate cables to connect the SCE 1000 to the network and console terminal
• Tape measure (optional)
• Level (optional)
• Number 1 Phillips screwdriver
• Number 2 Phillips screwdriver
• 1/4-inch flat-blade screwdriver
• 1/4-inch hex wrench
2
Regulatory Compliance and Safety Information for the Cisco Service