Cisco UBR7246VXR Schnellstart-Handbuch - Seite 14
Blättern Sie online oder laden Sie pdf Schnellstart-Handbuch für Netzwerk-Hardware Cisco UBR7246VXR herunter. Cisco UBR7246VXR 27 Seiten. Universal broadband router
Auch für Cisco UBR7246VXR: Benutzerhandbuch (7 seiten), Installationshandbuch (28 seiten), Hardware-Installation (25 seiten)
Ensure that there is no power going to the router.
Step 1
Strip approximately 0.75 in (2 cm) of shielding from the wire.
Step 2
Step 3
Insert the stripped end of the wire into the open end of the ground lug, and crimp the lug.
Step 4
Slide a segment of heat shrink tubing over the exposed grounding lug and wire connection.
Shrink the tubing in place, using a suitable heating device.
Step 5
Attach the grounding lug to the router using two M5 hex head screws. See Figure 9 on page 13.
Step 6
Step 7
Connect the other end of the grounding wire to an appropriate ground source.
14