aerauliqa QR590E Installationshandbuch - Seite 16
Blättern Sie online oder laden Sie pdf Installationshandbuch für Heizungsanlage aerauliqa QR590E herunter. aerauliqa QR590E 20 Seiten. Energy recovery ventilation unit with enthalpic heat exchanger
8.3 Maintenance
Make sure that the mains supply to the unit is disconnected before performing any installation, service, maintenance or
• Keep the unit surface free from dust.
• Clean the filters with a vacuum cleaner following the below illustrations (Fig. 8b-c-d-e-f-g) when the FILTER signal is displayed
on LCD. Their maintenance may differ per situation depending on the internal and external environmental conditions.
• Press FILTER button (Fig. 7.b - ) to reset the Filter Alarm.
• Filters must be replaced every year.
Fig. 8.b
Fig. 8.d
Fig. 8.f
16
WARNING
electrical work!
L
Fig. 8.c
Fig. 8.e
Fig. 8.g