ACR Heat HERITAGE N25 Manual de instrucciones de instalación y funcionamiento - Página 3

Navegue en línea o descargue pdf Manual de instrucciones de instalación y funcionamiento para Chimenea de interior ACR Heat HERITAGE N25. ACR Heat HERITAGE N25 10 páginas.

GENERAL INFORMATION
Output
Chimney Draft required
Weight
Flue Diameter
Material
OPTIONAL EQUIPMENT
Multifuel grate and ashpan kit
PLEASE INSERT LINE DRAWING SHOWING FULL MEASUREMENTS
OF THIS MODEL – FRONT & SIDE DRAWINGS IF POSSIBLE PLEASE
CLEARANCES REQUIRED
Hearth Requirements
The appliance must stand on a fireproof hearth made of non-combustible
materials with a minimum thickness of 12mm.
constructed on timber there must be a clearance of at least 250mm from
the timber to the top surface of the hearth. A 300mm hearth must be
provided to the front of the appliance with 150mm of hearth either side of
the appliance. (All clearances are based on brickwork of a minimum of
200mm thickness)
A gap of 150mm is required at the back of the appliance from a non-
combustible wall. This can be reduced to a minimum gas of 50mm when
the non-combustible wall is at least 200mm thick.
A clearance of 300mm from the top of the appliance (not including
canopy) is required.
THE MANUFACTURER WILL NOT BE HELD RESPONSIBLE FOR
DAMAGES TO THE APPLIANCE DUE TO THE USE OF PROHIBITED
FUEL OR IF THE APPLIANCE HAS NOT BEEN INSTALLED AS PER THE
MANUAL AND / OR CURRENT BUILDING REGULATIONS

PRODUCT INFORMATION

2–12Kw (doors closed) 2–7Kw (doors open)
Cast Iron
3
If the hearth is