Aktobis WDH-35B Manual - Página 5

Navegue en línea o descargue pdf Manual para Secadora Aktobis WDH-35B. Aktobis WDH-35B 8 páginas. Building dryer

Instructions for use:
1. Commissioning
Insert the mains plug properly into the socket.
Switch on the unit with the main switch ( I / O ).
The unit is programmed so that the building dryer runs in continuous operation (continuous dehumidification). This
means that you do not have to make any further settings.
Switch the unit off again with the main switch ( I / O ) if dehumidification is no longer required.
Operating instructions
To protect the compressor, the unit should always run for at least 3 minutes or be switched off before you press the
main switch ( I / O ) again!!!
In case of cold ambient temperatures or icing in the unit, a sensor automatically controls a defrosting process.
Meanwhile, the defrost mode automatically controls the air circulation and compressor operation !
2. Connecting a hose
2.1 The connection point for the drain hose is on the right-hand side of the condensation tank (see diagram below).
First remove the black sealing plug there.
2.2 It is best to use a ½ inch plastic hose and pass it through the hole provided on the side and then put the hose
over the plastic tap provided.
2.3 Make sure that it fits properly. For safety, we recommend fixing the hose with a clamp/clip !
2.4 Make sure that the hose does not kink and must always have a slight slope !
Condensation
tank
Plastic tap
Sealing plug
Aktobis AG, Borsigstr. 20, D-63110 Rodgau / Germany
www.AKTOBIS.de
Side hose hole