AUSTRALIAN MADE GREAT MATE Instrucciones de instalación y configuración - Página 7
Navegue en línea o descargue pdf Instrucciones de instalación y configuración para Motor AUSTRALIAN MADE GREAT MATE. AUSTRALIAN MADE GREAT MATE 20 páginas. Double swing gate motor kit
Battery Connection for Bench Testing
ALWAYS TURN THE POWER OFF AND DISCONNECT THE BATTERY BEFORE MAKING
Slave Motor Power Wires and
Connection Terminal Block
Connect a 2 core wire (1.5mm Twin Active cable) from the slave motor connection terminal block
to the unused motor terminals on the circuit board.
Battery Connection
Double piggy back spade
connectors for solar power or
single spade connectors for
transformer power
Place the battery on the bench between the motors
Refer to the "DC 2 Circuit Board" data sheet included with this manual and locate the battery
wires on the circuit board. Ensure the battery wires are correctly connected to the correct
terminals on the circuit board. Connect the other end of the battery wires to the battery terminals
on the battery. Note the polarity (
battery terminal). The board should now be powered and great care should be taken to avoid
shorting out or otherwise damaging the circuit board.
WARNING: Care should be taken as there are moving components inside the
gate motor that may cause damage or personal injury.
Pre-Installation Set Up and
Testing
Double Swing Gate
ANY WIRING CONNECTIONS
2 Core 1.5mm
Twin Active
Cable
Red
wire to
Red
© 2012 G Force Automatic Gates All Rights Reserved
Motor M2
Terminals
battery terminal, Black / Blue wire to Black
Battery
Wires
Motor M1
Terminals