AFFIX MADW-AGR Series Manual de montaje - Página 9

Navegue en línea o descargue pdf Manual de montaje para Escritorio AFFIX MADW-AGR Series. AFFIX MADW-AGR Series 20 páginas. Aluminium double width mobile towers

AFFIX MADW-AGR Series Manual de montaje
ASSEMBLY
08
Step 5
Step 5.1
Step 5.1
Hook the top rung of the AGR frame to
the top rung of the 2nd level frames and
the bottom rung of the AGR frame should
be hooked to the 1st rung of the 2nd level
frames.
Step 5.2
Repeat Step 5.1 for the opposite side but
slide it towards the frame ladders to
provide cover to the platform.
Step 6
Clamp the 4 Stabilizers on all 4 corners
as per the Components Table on Page
no. 17. For detailed instructions on
installation refer to Page no.15.