ADEN POWERKIT GO Manual de instrucciones y montaje - Página 13

Navegue en línea o descargue pdf Manual de instrucciones y montaje para Accesorios para bicicletas ADEN POWERKIT GO. ADEN POWERKIT GO 16 páginas.

POWERPACK — ASSEMBLY INSTRUCTIONS
ADEN GmbH
BATTERY USE

Commissioning

To activate the support via the thumb lever or the twist grip, the crank
must be moved (pedal sensor).
The motor starts up by lightly operating the thumb lever or the twist grip.
The "further the turn", the stronger the support.
Attention:
When pedalling and giving "full throttle" at the same time,
the front wheel could rise unintentionally.

Using the Charger

The charger is plugged into a socket connected and then the
yellow plug with the Battery connected.
The red LED on the charger lights up - charging is in progress
If the battery is completely discharged, it takes about 2 hours
until the battery is fully charged again.
The green LED on the charger lights up
- Charging completed / battery charged
The battery can now be unplugged.
For longer storage, it is recommended
to have the battery charged to approx. 50%.
www.aden-sports.com
EN | P. 13