Adey Mini 230 Instalación y mantenimiento - Página 3
Navegue en línea o descargue pdf Instalación y mantenimiento para Bomba de agua Adey Mini 230. Adey Mini 230 17 páginas. Digital pressurisation unit
CHECKLIST
IMPORTANT: With the appliance removed from its packaging check for any damage prior
to installation. If any damage is found contact ADEY Commercial Ltd within 24 hours of
receipt.
A
D
Front cover removed for clarity
H
Item Description
A
APU
B
Front cover
Flexible hose, G ½ 15 mm
C
compression
D
M6 screw
E
Wall mounting plate
Note: Your product may vary slightly from the picture above.
B
E
Electrical rating
F
plate & serial
number
G
C
Fig . 1
Qty Item Description
F
1
Fill valve flow restrictor, blue
Rubber hose sealing washer, to
1
G
be used with item C
H
1
Cable tie
I
1
Instruction book
1
- 4 -
1 IMPORTANT FACTS:
A Water storage capacity .
1 .11
The APU Mini has a usable water volume of approximately 2 litres; the length
of time the APU takes to pressurise a system will be dependent on the pressure
differential between the cold fill and set pressures and also the refill rate of the tank .
1 .12 Ensure the pumps are primed as described in the priming section before
starting, to avoid causing damage to the pump . See Section 6 .20 Hydraulic
commissioning .
B Water temperature
This unit is designed to pump cold water only which should not exceed the following
values:
1 .13 The maximum allowable water temperature is 23
1 .14 The minimum allowable water temperature is 4
C Pipework - General
1 .15 Do not drill holes or put fastenings into the APU Mini tank, this will cause
leakage .
1 .16 Secure pipework: Ensure pipework to and from pump is independently
supported & clipped to prevent forces being transferred to inlet and outlet
branches of the unit . Do not secure pipework to the APU Mini, this will cause
damage and possible leakage .
1 .17 Flux: Solder joints must be completed and flux residues removed prior to APU
Mini installation (flux damage will void any warranty) .
1 .18 Pipework design: Care should be taken in the design of pipework runs to
minimize the risk of air locks e .g . use drawn bends rather than 90
1 .19 DO NOT introduce solder flux to flexible hose, tank, pump or any
1 .20 DO NOT allow contact with oil or cellulose based paints, paint thinners or
1 .21
D Plumbing installation regulations
Qty
1 .22 The plumbing installation must comply with the current water and building
1
regulations .
1 .23 The plumbing installation must be installed by a qualified person .
1
E System filling
2
1 .24 The APU Mini is NOT DESIGNED TO FILL THE SYSTEM FROM EMPTY .
It is only intended to top up the system after occassional water leakage .
1
Systems should be filled via a dedicated filling loop .
READ BEFORE COMMENCING PUMP INSTALLATION
C (see Technical Section) .
o
C .
o
parts manufactured from plastic .
strippers, acid based descalents or aggressive cleaning agents .
DO NOT bend the flexible hose beyond 90
detailed, DO NOT kink . See Installation Section 4 .14 .
- 5 -
o
bends .
. It must be installed as
o