Miele Imperial DWF 956-2 Instrucciones de funcionamiento e instalación - Página 29

Navegue en línea o descargue pdf Instrucciones de funcionamiento e instalación para Campana de ventilación Miele Imperial DWF 956-2. Miele Imperial DWF 956-2 37 páginas.

– Now hold the main shaft gently apart
and fit it over the extension piece.
– Push the shaft down approx. 1 cm
into the vapour canopy.
– Adjust the shaft.
– Loosen and then remove the protec-
tive sheets.
– Now secure the shaft on both sides
with two 3.9 x 7.5 screws.
– Cover the screw heads with the
cover caps supplied.
29