Accurion i4 Series Manual de instrucciones - Página 5
Navegue en línea o descargue pdf Manual de instrucciones para Equipos de laboratorio Accurion i4 Series. Accurion i4 Series 14 páginas. Active vibration isolation halcyonics workstation
5. Getting Started and Operation
Setting Up the Equipment
To obtain best performance from the halcyonics_workstation_i4, set it up on a stable, rigid flat surface.
For optimal operating results, the planarity of the support surface should be 0.5 mm. Carpet or other soft
floor coverings should be removed.
To set up your vibration isolation equipment, select a place with a vibration level that is as low as
possible. Vibration generated at this place should not exceed velocities of 500 µm/s.
Operating the system at low temperatures may cause malfunctioning. If the equipment is
brought from a cold environment into a relatively warmer one, we recommend that you wait
approx. 2 – 3 hours before plugging it into AC power and switching on the power.
Start-up
Set up the system on a suitable surface as described above.
Align the workstation with a water level, using a jaw wrench - size 24 to adjust the feet.
Make sure that all 4 frame feet stand on the ground.
After the workstation is balanced, lock the counternuts by using the jaw wrench.
Use the power cord supplied to connect the system into the power socket to your local power.
Center your application on the working surface.
Turn on the power switch on the control panel of the system.
Press the Load Adjust button for automatic load adjustment (see page 7)
Set the switch for active isolation to on, blue LED is on (see page 8)
Alignment of the Workstation
- 5 -