Accuris SmartDoc 2.0 Manual de instrucciones - Página 5

Navegue en línea o descargue pdf Manual de instrucciones para Equipos de laboratorio Accuris SmartDoc 2.0. Accuris SmartDoc 2.0 8 páginas. Imaging enclosure
También para Accuris SmartDoc 2.0: Manual de instrucciones (8 páginas), Filtro y manual de usuario (1 páginas)

Power switch
Gel Preparation and
cutting surface
4. SETTING UP THE SMARTDOC
Assemble the components of the SmartDoc 2.0 System as pictured in section 3 of
the manual. Depending on the size of the gels to be imaged, or the desired detail
of the image, the extender piece can be connected or removed. The top, smart
phone platform piece connects either to the top of the extender or to the top of
the main enclosure. These parts will snap together and pull apart with gentle
pressure.
Once the top platform, extender and main housing parts are assembled, these
can be fit over the illumination base, which in turn fits over the gel preparation
surface.
Locate the SmartDoc near an electrical outlet. Plug the appropriate end of the
power adapter cord into the 12V DC input jack on the illumination base. Plug one
end of the power cord into the adapter box and the other end into a suitable
outlet. Press the power switch to check operation of the lights.
12V DC input jack
AC/DC 12V Power
Pack and Plug Cord
5
Blue light
illumination base