Cisco ASR 920 series Manual de instalación - Página 7
Navegue en línea o descargue pdf Manual de instalación para Interruptor Cisco ASR 920 series. Cisco ASR 920 series 42 páginas. Aggregation services router
También para Cisco ASR 920 series: Manual de instalación (36 páginas), Primeros pasos (6 páginas), Manual de instalación del hardware (46 páginas), Manual (36 páginas)
Installing the Cisco ASR 920 Series Router
Installing the Router Chassis in the Rack
Note
Ensure adequate air flow when mounting the router in a rack. For more information, see the "Air Flow
Guidelines" section on page 11 .
Note
Install the cable guides before installing the router in a 19-inch EIA rack. See
To install the router chassis in the equipment rack, perform these steps:
SUMMARY STEPS
1. Position the chassis in the rack as follows:
2. Align the mounting holes in the bracket (and optional cable guide) with the mounting holes in the equipment
rack.
3. Install the four M6x12mm zinc-plated steel screws through the holes in the bracket and into the threaded
holes in the equipment rack posts.
4. Use a tape measure and level to verify that the chassis is installed straight and level.
DETAILED STEPS
Step 1
Position the chassis in the rack as follows:
• If the front of the chassis (front panel) is at the front of the rack, insert the rear of the chassis between the mounting
posts.
• If the rear of the chassis is at the front of the rack, insert the front of the chassis between the mounting posts.
Step 2
Align the mounting holes in the bracket (and optional cable guide) with the mounting holes in the equipment rack.
Cisco ASR 920 Series Aggregation Services Router Hardware Installation Guide
Installing the Router Chassis in the Rack
Attaching the Cable
Guides.
7