Cisco SCE8000 GBE Instalación de - Página 14
Navegue en línea o descargue pdf Instalación de para Hardware de red Cisco SCE8000 GBE. Cisco SCE8000 GBE 21 páginas. 10gbe platform
También para Cisco SCE8000 GBE: Manual de inicio rápido (25 páginas), Manual de configuración (18 páginas), Procedimientos de extracción y sustitución (36 páginas)
Installing the Cisco SCE8000 Chassis in the Rack
Installing the Cisco SCE8000 Chassis in the Rack
This section describes how to install a Cisco SCE8000 platform in a rack. For first-time installations,
perform the procedures in the following sections in the order listed:
•
•
•
•
•
•
Before starting the installation procedures in this chapter, see the
Note
page 4-12 to verify that all site planning activities were completed.
Unpacking the Cisco SCE8000 Chassis
Tip
Do not discard the shipping container when you unpack the Cisco SCE8000. Flatten the shipping cartons
and store them with the pallet. You need these containers to move or ship the Cisco SCE8000.
Perform the following to check the contents of the shipping container:
•
•
Cisco SCE8000 10GBE Installation and Configuration Guide
4-14
Unpacking the Cisco SCE8000 Chassis, page 4-14
Installation Guidelines, page 4-15
Required Tools, page 4-15
Installing the Chassis Brackets, page 4-16
Installing the Chassis in the Rack, page 4-16
Installing an Optical Bypass Module, page 4-18
Check the contents of the accessories kit against the list of accessories in the
Component and Accessory
all listed equipment, which should include the following:
Hardware and software documentation, if ordered
–
Optional equipment that you ordered, such as network interface cables, transceivers, or special
–
connectors
Check the modules in each slot. Ensure that the configuration matches the packing list and that all
the specified interfaces are included.
Lists" section on page 2-13 and the packing slip. Verify that you received
Chapter 4 Installing the Cisco SCE8000 Chassis
"Site Planning
Checklist" section on
"Cisco SCE8000
OL-21054-04