Cisco SG 100D-08 Manual de inicio rápido - Página 5

Navegue en línea o descargue pdf Manual de inicio rápido para Hardware de red Cisco SG 100D-08. Cisco SG 100D-08 13 páginas. Unmanaged gigabit switch with qos
También para Cisco SG 100D-08: Manual de inicio rápido (8 páginas), Manual de inicio rápido (13 páginas)

Cisco SG 100D-08 Manual de inicio rápido
3
Installing the Cisco
SG 100D-08
The unmanaged switch can be placed on a wall or a flat surface. Do not
deploy the device in a location where any of the following conditions exist:
High Ambient Temperature—The ambient temperature must not
exceed 104 degrees Fahrenheit (40C).
Reduced Air Flow—Both side panels must be unobstructed to prevent
overheating.
Mechanical Overloading—The device should be level, stable, and
secure to avoid it sliding or shifting out of position.
Circuit Overloading—Adding the device to the power outlet must not
overload that circuit.

Wall Mounting

Before you begin, you need 2 wallboard screws to mount the unmanaged
switch. We recommend using screws with a minimum of 0. 1 6 inches (4mm)
width at the head and a shaft diameter of at least 0.06 inches (1.5mm).
Cisco is not responsible for damages incurred by insecure wall-
W
ARNING
mounting.
To mount the unmanaged switch to the wall:
Determine where you want to mount the unmanaged switch. Verify
S
1
TEP
that the surface is smooth, flat, dry, and sturdy.
Drill two pilot holes into the wall surface.
S
2
TEP
Cisco SG 100D-08: The screws should be 2.5 in. (63.5 mm) apart.
The wall-mount slots are two crisscross slots on the bottom panel
of the unmanaged switch.
5
Cisco SG100D-08 Unmanaged Gigabit Switch Quick Start Guide