Cisco TelePresence Server 7010 Manual de instrucciones de sustitución - Página 12

Navegue en línea o descargue pdf Manual de instrucciones de sustitución para Hardware de red Cisco TelePresence Server 7010. Cisco TelePresence Server 7010 23 páginas. 600w ac-input power supply and fan tray replacement
También para Cisco TelePresence Server 7010: Manual de instrucciones de instalación (15 páginas), Manual de instalación (14 páginas), Primeros pasos (16 páginas), Manual de instrucciones de sustitución (18 páginas)

Cisco TelePresence Server 7010 Manual de instrucciones de sustitución
Replacing the Chassis
Figure 6

Installing the Cable Management Brackets

The cable management brackets help to keep network interface cables untangled and orderly, and
prevent cables from hindering access to interface processors in the lower interface processor slots.
The brackets attach to the inner sides of the chassis at the interface processor end. Six M3 x 8-mm,
Phillips panhead screws, which are included with the brackets, secure the brackets to the chassis
(three per bracket). Figure 7 shows the interface processor end of the chassis with the brackets
installed.
Note
referred to as the chassis.
Install the brackets on the new chassis first, before you begin moving system components from the
old chassis. If you install the brackets after you move the interface processors and connect the
interface cables, you might have to disconnect the cables to install the screws that secure the
brackets. Route interface cables through the cable management brackets as you connect them to the
interface processor ports (or as you install interface processors that still have interface cables
connected to them). Wrap cable ties through the holes provided to secure small-gauge cables.
12 Cisco 7010 and Cisco 7505 Chassis Replacement Instructions
Installing the Chassis in a Standard Four-Post, 19-Inch Equipment Rack
Chassis front
For this procedure, the Cisco 7010 and Cisco 7505 chassis are functionally the same, and are