Cisco MC2000 Manual de instrucciones - Página 18

Navegue en línea o descargue pdf Manual de instrucciones para Servidor Cisco MC2000. Cisco MC2000 20 páginas. Firepower management center
También para Cisco MC2000: Manual de introducción (42 páginas)

Cisco MC2000 Manual de instrucciones

Installing the Chassis Cover

Figure A-17
1
What to Do Next:
Installing the Chassis Cover
FireSIGHT Management Centers have covers that slide on from the rear of the chassis. There are slight
differences between chassis models which are described in the following sections:
Installing the Cover on Firepower Management Center 750
To install the cover on a Firepower MC750:
Note
A nonskid surface or a stop behind the MC750 may be needed to prevent the device from sliding on your
work surface.
Step 1
Place the cover onto the chassis and slide forward (see "1" in
Step 2
Install the security screws on the front of the chassis:
Cisco Firepower Management Center 750, 1500, 2000, 3500, and 4000 Hardware Installation Guide
A-18
Installing the PCI Riser Assembly on a MC1500 or MC3500
PCI riser assembly
Reconnect any cables attached to any add-in cards.
Install the chassis cover as described in the
1500 and 3500" section on page
Installing the Cover on Firepower Management Center 750, page A-18
Installing the Cover on Firepower Management Center 1500 and 3500, page A-20
Appendix A
Memory Upgrade Instructions for Firepower Management Centers
— —
"Installing the Cover on Firepower Management Center
A-20.
Figure A-18
and
Figure
A-19).