Cisco ONS 15454 Instale - Página 10
Navegue en línea o descargue pdf Instale para Servidor Cisco ONS 15454. Cisco ONS 15454 32 páginas. Four-shelf and zero-shelf bay assembly
También para Cisco ONS 15454: Manual de instrucciones de instalación (22 páginas), Instale (32 páginas), Desembalaje e instalación (42 páginas), Desembalaje e instalación (40 páginas)
NTP-A7 Install the Fan-Tray Assembly
A readily accessible two-poled disconnect device must be incorporated in the fixed wiring. Statement
Warning
1022
When installing redundant power feeds, do not use aluminum conductors.
Warning
Warning
If you use redundant power leads to power the ONS 15454, disconnecting one lead will not remove
power from the node.
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
Caution
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
Verify one of the following:
Step 1
•
•
Complete the
Step 2
Complete the
Step 3
Complete the
Step 4
Continue with the
Step 5
Stop. You have completed this procedure.
NTP-A7 Install the Fan-Tray Assembly
Purpose
Tools/Equipment
Prerequisite Procedures
Required/As Needed
Onsite/Remote
Security Level
Cisco ONS 15454 Procedure Guide, R5.0
1-10
If you have the 15454-SA-ANSI or 15454-SA-HD shelf, a 100-A fuse panel (30-A fuse per shelf
minimum) should be installed. If not, install one according to manufacturer's instructions.
If you have the 15454-SA-NEBS3 shelf, a standard 80-A fuse panel (20-A fuse per shelf minimum)
should be installed. If not, install one according to manufacturer's instructions.
"DLP-A16 Connect the Office Ground to the ONS 15454" task on page
"DLP-A17 Connect Office Power to the ONS 15454 Shelf" task on page
"DLP-A18 Turn On and Verify Office Power" task on page
"NTP-A7 Install the Fan-Tray Assembly" procedure on page
This procedure installs the fan-tray assembly.
#2 Phillips screwdriver
Medium slot-head screwdriver
Small slot-head screwdriver
NTP-A3 Open and Remove the Front Door, page 1-6
NTP-A6 Install the Power and Ground, page 1-9
Required
Onsite
None
Chapter 1
Install the Shelf and Backplane Cable
17-18.
17-19.
17-21.
1-10.
March 2005