NTP-A5 Install the EIAs
Onsite/Remote
Security Level
Always use the supplied ESD wristband when working with a powered ONS 15454. Plug the wristband
Caution
cable into the ESD jack located on the lower-right outside edge of the shelf assembly.
EIAs are normally factory installed. Verify that the correct EIA is installed on the shelf assembly. If not,
Note
install the correct EIA.
Note
You do not need to power down the shelf before removing or installing an EIA. An in-service upgrade
of one EIA (A side or B side) is possible if all electrical traffic (DS-1, DS-3, DS3XM-6, and EC-1) is
being carried on the other side.

Complete the

Step 1

are locking connectors; the high-density BNC provides access to every port on every card.
Complete the
Step 2
up to 96 DS-3 circuits on each side of the ONS 15454.
Complete the
Step 3
every port on every card using more space and efficient cabling.
Complete the
Step 4
exclusive to DS-1 cables.
Complete the
Step 5
EIAs allow you to use high-density electrical cards. The UBIC-V EIAs provide SCSI connectors.
Complete the
Step 6
(horizontal) EIAs allow you to use high-density electrical cards. The UBIC-H EIAs provide SCSI
connectors.
Note
Continue with the
Step 7

Stop. You have completed this procedure.

Cisco ONS 15454 Procedure Guide, R5.0
1-8
Onsite
None
"DLP-A12 Install a BNC or High-Density BNC EIA" task on page 17-12
"DLP-A373 Install a MiniBNC EIA" task on page 20-57
"DLP-A13 Install an SMB EIA" task on page 17-15
"DLP-A14 Install the AMP Champ EIA" task on page 17-16
"DLP-A190 Install a UBIC-V EIA" task on page 18-61
"DLP-A399 Install a UBIC-H EIA" task on page 20-97
To attach cables to the EIAs, see the
Backplane" procedure on page
"NTP-A6 Install the Power and Ground" procedure on page
Chapter 1
"NTP-A9 Install the Electrical Card Cables on the
1-22.
Install the Shelf and Backplane Cable
as needed. BNCs
as needed. The MiniBNC allows
as needed. SMBs allow you to access
as needed. AMP Champs are
as needed. The UBIC-V (vertical)
as needed. The UBIC-H
1-9.
March 2005