Cisco UCS B200 M3 Nota de instalación y mantenimiento - Página 22

Navegue en línea o descargue pdf Nota de instalación y mantenimiento para Servidor Cisco UCS B200 M3. Cisco UCS B200 M3 28 páginas. Blade server
También para Cisco UCS B200 M3: Manual de instalación (34 páginas), Nota de instalación y mantenimiento (36 páginas), Nota de instalación y mantenimiento (37 páginas), Manual (8 páginas), Manual de actualización (21 páginas)

Cisco UCS B200 M3 Nota de instalación y mantenimiento
Step 3
Tighten the captive screw.
To remove a VIC, reverse the above procedure. You might find it helpful when removing the connector from
Tip
the motherboard to gently rock the board along the length of the connector until it loosens.
Figure 19: Installing a VIC mLOM Adapter
Installing an Adapter Card
All the supported mezzanine cards have a common installation process. These cards are updated frequently. Currently supported
cards and the available models for this server are listed in the specification sheets at this URL:
http://www.cisco.com/c/en/us/products/servers-unified-computing/ucs-b-series-blade-servers/datasheet-listing.html
If you are switching from one type of adapter card to another, before you physically perform the switch make sure that you download
the latest device drivers and load them into the server's operating system. For more information, see the firmware management chapter
of one of the Cisco UCS Manager software configuration guides.
Procedure
Step 1
Position the adapter board connector above the motherboard connector and align the two adapter captive screws to the
standoff posts (see callout 1) on the motherboard.
Step 2
Firmly press the adapter connector into the motherboard connector (see callout 2).
Step 3
Tighten the two captive screws (see callout 3).
Tip
Removing an adapter card is the reverse of installing it. You might find it helpful when removing the connector
from the motherboard to gently rock the board along the length of the connector until it loosens.
22