Autometers Systems A-400P Brochure de programmation et d'installation - Page 8

Parcourez en ligne ou téléchargez le pdf Brochure de programmation et d'installation pour {nom_de_la_catégorie} Autometers Systems A-400P. Autometers Systems A-400P 17 pages. Mid approved sgs.uk appendix b and d, measures kwh, kvarh, kvar,pf,hz, max demand, rs 485 modbus autometers v6 protocol, two pulse outputs, bi- directional measurement for import and export, back light lcd for full viewing angles, available as 1 phase 2 w

4.2 Change Password

4.3 DIT Demand Integration Time
This sets the period in minutes over which the current and power readings are integrated
for maximum demand measurement. The options are: 0, 5, 8,10,15, 20, 30, 60 minutes.
4.4 Backlit set-up
The meter provides a function to set the blue backlit lasting time (0/5/10/30/60/120 minutes).
Option 0 means the backlit always on here.
7
MD/
Use
and
P
PF/HZ
E
Press the
button to enter the change password routine. The new
password screen will appear with the first digit flashing.
MD/
Use
and
P
PF/HZ
selection. The next digit will flash.
Repeat the procedure for the remaining three digits.
After setting the last digit SET will show.
V/A
Press
to exit the number setting routine and return to the set-up
ESC
menu. SET will be removed.
From the set-up menu, use
option. The screen will show the currently selected integration time.
E
Press
to enter the selection routine. The current time interval will
flash.
MD/
Use
and
buttons to select the time required.
P
PF/HZ
E
Press
to confirm the selection. SET indicator will appear.
V/A
Press
to exit the DIT selection routine and return to the menu.
ESC
Default:60
If it's set to 5,the backlit will be off in 5minutes.
MD/
Use
and
P
PF/HZ
E
Press
to confirm the setting and press
up menu.
to choose the change password option.
to set the first digit and press
MD/
and
P
PF/HZ
buttons to choose the time
www.autometers.co.uk
E
to confirm your
buttons to select the DIT
V/A
to return to the main set
ESC