ADEN POWERKIT GO Manuel d'instruction et d'assemblage - Page 12
Parcourez en ligne ou téléchargez le pdf Manuel d'instruction et d'assemblage pour {nom_de_la_catégorie} ADEN POWERKIT GO. ADEN POWERKIT GO 16 pages.
POWERKIT GO — ASSEMBLY INSTRUCTIONS
ADEN GmbH
COMMISSIONING AND BATTERY USE
On some bikes there is the possibility to mount the battery as
shown in the picture.
If you need an additional battery to double the range, just send us
a request.
Now insert the yellow plug from the motor into the battery.
The battery is switched on via the button on the front left.
It should not be switched OFF and ON too quickly.
The drive is only active approx. 5 seconds after the battery has
been switched on.
It should always be ensured that the plug between the motor unit
and the battery is firmly connected!
Before the first trip, the battery should be fully charged once.
Battery almost empty - please charge!
As soon as the battery level falls below 20%, the
motor regulates the power down.
www.aden-sports.com
EN | P. 12