Autopot 8Pot system Manuels d'installation - Page 2
Parcourez en ligne ou téléchargez le pdf Manuels d'installation pour {nom_de_la_catégorie} Autopot 8Pot system. Autopot 8Pot system 2 pages.
8Pot system contents
• 1x 100 litre FlexiTank
• 1x 16mm inline tap
• 8x 1Pot tray and lid
• 4x 16 - 6mm cross connector
• 8x 15 litre pot
• 4 metres of 16mm pipe
• 8x AQUAvalve
• 4 metres of 6mm pipe
• 1x 16mm click-fit tank adapter
• 8x marix disc
and filter
• 8x root control disc
Suggested layout
System requires minimum
100 litre FlexiTank (supplied)
100 ltr
FlexiTank
AQUAvalve
16mm click-fit tank adaptor & filter
6mm pipe
•
Pot up your plants, water through, then allow your plants to establish in the pots for a period of 7 to 10
days before turning your system on. This will encourage a stronger and healthier root system.
•
Always raise your tank to a minimum of 150mm above the highest AQUAvalve and re-fill the tank when
there is approximately a 1/3 of the solution left - NEVER ALLOW THE TANK TO RUN EMPTY.
•
For best results, we recommend mineral fertilisers. Do not use organic fertilisers, as they have a tendency
to block small pipe work.
•
Clean all substrate from the bottom and sides of the pots before placing in each tray.
This will ensure your system is clean from the start.
•
Always use free draining substrates, for example: soil/perlite, coco/perlite, soil/clay pebbles,
coco/clay pebbles, rockwool/clay pebbles.
[email protected] I www.autopot.co.uk I +44 (0)844 8581520
Plan views
and options
16mm pipe
16mm – 6mm cross connector
16mm in-line tap
Advice
1Pot dimensions
1
Put black marix
disc in pot
3
Remove collar
Push 6mm pipe through
collar and attach to
AQUAvalve nozzle
Rescrew collar - DON'T
overturn... when you
feel it grip STOP
5
Position tray
so it is level
Insert root control
disc Gold face up
7
According to the size of your system connect your
6mm/16mm pipe to relevant fitting or tank...
Using your front instruction sheet, repeat the module set up instructions for the number of trays.
Allow your plants to establish for 7-10 days before turning system on
Advice
If you require any guidance email - [email protected]
1Pot setup
instructions
100 ltr
FlexiTank
432mm
2
Fill pot with medium
and pot up plants.
Water through pot
and allow to drain
outside the tray.
4
Connect AQUAvalve
so 'half moon' is on
T section in the tray
6
Cut 6mm/16mm pipe
to appropriate length
8
Place
pot
in
the
tray, make sure it is
CLEAN!
Place lid over valve
onto tray