AFL Hyperscale H-Series 7RU Housing Manuel d'installation - Page 11

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} AFL Hyperscale H-Series 7RU Housing. AFL Hyperscale H-Series 7RU Housing 16 pages.

H-Series 7RU Housing
Loading the Cables
Remove dust caps and load the cables as illustrated below.
24f LC Pass-Through Cassette
7c
Open the cassette and install connectors into the back of the adapters as required. Once installed screw the cassette closed,
install into the housing and patch from the bottom of the cassette to the top.
Note:
Assemblies not included with cassette.
MPO Cassette BASE-12 144f
H-Series Housing can accommodate up to 12 MPO BASE-12 144f Cassettes. Start to patch from the bottom of the cassette
7d
to the top following indications at the front of the cassette. Cassette can be used with MPO pre-terminated assemblies
or FUSEConnect.
11
© AFL Hyperscale. All rights reserved
Series