AFL Hyperscale 20RU Manuel d'installation - Page 9

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} AFL Hyperscale 20RU. AFL Hyperscale 20RU 20 pages. Mass-fusion splice cabinets

Cable Installation

14.
Remove the cable tie bracket (E).
Strip cable jacket approx. 2.5m (8.2ft) according
16.
to cable manufacturer's guidelines.
20RU & 37RU Mass-Fusion Splice Cabinets
15.
Slide the hose clamp over cable end (K).
NOTE: 6 Way, up to Ø12mm cable tie
off bracket available - P/N: CTB612 -
max.4 per manifold allowing 24 cables
Fix the cable to the tie bracket (E) with the hose
17.
clamp (K). ALWAYS START IN THE REARMOST
POSITION.
© AFL Hyperscale. All rights reserved
9