Airflow Vector S002D Manuel d'instructions - Page 10
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions pour {nom_de_la_catégorie} Airflow Vector S002D. Airflow Vector S002D 16 pages. Snorkel kit for the jeep grand cherokee wj / wg diesel
Airflow Vector Pty Ltd
4 Collins Rd, DROMANA VIC. 3936
AUSTRALIA
Ph: +61 3 5987 3733
www.airflowvector.com
3.47 Fit the five studs SP022
(20mm must protrude) and
secure them with a locking
compound
Note: This Snorkel is fitted with a second "A" pillar location to be installed
if one intends to use the Collector Pre-Cleaner instead of the Air Ram. If
required, please contact us to obtain the Bolt Kit SK203
3.49 Pre fit the snorkel to the
guard to allow the marking of
the "A" pillar bracket
3.52 Centre punch the 2 holes
Page 10 of 16
3.48 Fit the "A" pillar bracket
SP043 with the washer
SP023 and bolt SP024
Do not over tighten fixings to
avoid damage to the snorkel
3.50 Mark two holes of the "A"
pillar bracket onto the paint
3.51 Remove the snorkel
3.53 Using a 4mm bit, pre-drill the
two holes
21 March 2011
SD002DE (S002D Instructions booklet).doc