A-T Controls Triac FD9 SERIES Manuel d'entretien - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'entretien pour {nom_de_la_catégorie} A-T Controls Triac FD9 SERIES. A-T Controls Triac FD9 SERIES 3 pages. Firesafe full port ball valve 150 / 300 ansi flanged

7.
VISUAL INSPECTION:
7.1 Clean and inspect metal parts. It is not necessary to replace neither ball nor stem unless the surface has signs of
abrasion or corrosion. We strongly recommend replacement of all soft parts whenever the valve is disassembled for
reconditioning. We provide replacement kits that contain all the replaceable parts.
Note: The valve may be assembled and operated dry with any lubricant. However, a light lubrication will aid in
assembly and reduce initial operating torque. Lubricant used must be acceptable with the intended line fluid.
8.
ASSEMBLY
Install one seat in the body cavity with the spherical curvature facing the ball.
8.1 Install the thrust washer on stem and slide the stem up through the body. Install packing, gland, belleville washers,
locking saddle. Screw the packing nut into the stem. Lock the saddle in place.
8.3 Install stop plate, handle and washer. Screw the stem nut into the stem until the handle is secure.
8.4 Turn handle to the closed position. Line up the ball slot with the stem end and slide the ball into position. Turn the
handle to the open position to hold the ball in place.
8.5 Install the remaining seat into body side.
8.6 Put body seal gasket into body and line up end flange. Because the body flange bolt pattern is different from the line
flange bolt pattern, it is possible to assemble the valve such that the line flanges bolt pattern don' t line up. Be
certain to align end flanges bolt holes to straddle valve center lines. Be careful not to damage body seal when
putting cap end into body.
8.8 Install cap end nuts and tighten in the "star" pattern to the proper torque. Extreme care must be exercised during
adjustment of cap end nuts to make sure that complete engagement of the studs with body flange is maintained.
There should be at least one stud thread exposed on each side.
8.9 Cycle the valve slowly, with a gentle back and forth motion, to build gradually to the full quarter turn. By cycling
slowly, the seat lips will assume a permanent seal shape against the ball. A fast turning motion, at this point, may
cut the seats before they have a chance to form the proper seal.
8.10 Test valve, if possible, prior to placing valve back into line position. If not properly secured, the valve can separate
from the pressure source, resulting in possible injury. Always join the valve to companion flanges of same pressure
rating as valve and secure with a full set of flange bolts.
TEST AS FOLLOWS:
A.
Secure valve to a test fixture by means of a mating flange with full bolting and a suitable gasket. Orient valve so
seat to be tested is facing up.
B.
Introduce 50 to 100 psig air. Partially cycle the valve, under pressure, then slowly close to make sure the cavity is
pressurized (use hearing protection). Pour water into the upper port to cover the ball and visually check for bubbles.
If bubbles appear, pour the water out, cycle the valve several times and recheck. To check for leakage in the other
port, reverse the valve and introduce air pressure to the port just checked.
C.
Check stem seal at this time by coating the stem top area with a water/soap solution. If leakage occurs, tighten stem
seal just until leakage stops.
Valve Size
Break Away Torque
150# Flange
½"
110
¾"
140
1"
175
1-1/2"
400
2"
450
2-1/2"
620
3"
1000
4"
1600
6"
2700
www.a-tcontrols.com
(In-lbs.)
300# Flange
125
175
220
450
525
750
1400
1900
3050
Full Port Ball Valve 150# / #300 ANSI Flanged
Installation & Maintenance Manual
Torque of Body Bolts
(In-lbs.)
174 ~ 200
200 ~ 217
260 ~ 286
286 ~ 304
347 ~ 391
347 ~ 391
477 ~ 521
477 ~ 521
477 ~ 521
2
\\Atfs1\Engineering\documents\products\IOM\IOM7015
FD9 SERIES Firesafe
Torque of Stem Nut
(In-lbs.)
130
130
130
208
208
208
304
304
391
December 5, 2011