Anchor Installation: New Construction
For new pool deck installations, the footing for the pool lift should be at least 3'-6" x 3-6" x 6" deep.
It should be reinforced with one mat of four (4) #4 reinforcing bars (rebar) that are 2" clear from
the top of the new pour. (Reinforcing mesh can be used instead of rebar - check the local code
requirements. See drawing below).
8-AWG SOLID-
COPPER WIRE
(ATTACH TO
BONDING GRID)
BONDING-LUG
FIGURE 7
The footing for the lift should be tied into the rest of the pool deck on three sides with the rebar
or reinforcing mesh. (Do not tie into the bond beam). The rest of the pool deck can be a typical 4"
thick or thickened per local code requirements. Bond rebar or reinforcing mesh grid according to
local requirements and also bond the anchor system to the rebar/mesh grid.
Copyright © 2015 Aqua Creek Products All Rights Reserved
42"
10"
42"
10"
*SETBACK DISTANCES ARE
FOR FLAT DECKS . IF YOUR
DECK IS SLOPED , CONTACT
AQUA CREEK BEFORE
INSTALLATION.
14"
4"
6"
(FLORIDA HAUNCH)
38" MAX
"GATOR-HAUNCH"
22"
ANCHORS FLUSH
W/DECK SURFACE
*38"
MAXIMUM
SETBACK
*36"
MAXIMUM
FLORIDA
HAUNCH
POOL WALL
FLAT-DECK
POOL WALL
FLORIDA
PROFILE
FLAT DECK