Miele DA 249-4 Alu Instructions d'utilisation et d'installation - Page 17
Parcourez en ligne ou téléchargez le pdf Instructions d'utilisation et d'installation pour {nom_de_la_catégorie} Miele DA 249-4 Alu. Miele DA 249-4 Alu 44 pages.
Également pour Miele DA 249-4 Alu : Instructions d'utilisation et d'installation (40 pages)
To switch the hob lighting on
The hob lighting can be switched on
and off independently of the fan.
^ Briefly press the lighting control to
switch on the hob lighting.
The indicator lamp will come on.
The hob lighting will switch on at
maximum brightness.
To dim the hob lighting
The brightness of the lighting can be
adjusted.
^ With the lighting switched on, press
and hold the hob lighting control in.
The brightness will gradually dim until
you release the control.
^ Press the control in again to increase
the brightness to the level required,
and then release it.
If you keep the control pressed in, the
light will continually change between
bright and dim.
To switch the hob lighting off
^ Press the hob lighting control briefly
to switch the lighting off.
The indicator lamp will go out.
Safety cut-out
Should the cooker hood be left on, the
fan will switch off automatically after 10
hours. The lighting will remain on.
^ Pressing the On/Off control will
switch the fan back on again.
Filter operating hours counter
The number of hours the appliance has
been in operation is stored in memory.
The operating hours counter tells you
when the grease filters or charcoal filter
need to be cleaned or replaced.
Resetting the operating hours
counter for the grease filter
After 30 hours of operation (or another
time if the operating hours counter has
been altered), the grease filter indicator
lamp will light up. The grease filter and
the stainless steel outer filter must then
be cleaned.
Afterwards, the filter operating hours
counter must be reset.
^ To do this, press and hold the grease
filter control in for approximately
3 seconds while the fan is switched
on.
The indicator lamp for the control will
go out.
Operation
17