ABBA STB16 Manuel d'installation - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} ABBA STB16. ABBA STB16 4 pages. 12v landscape light specialist

fixture(s) must be installed in accordance with all local codes and ordinances.
Do not instal within 10 feet of a pool, spa or fountain
To ensure optimal performance and safety, it is
important to use our fixtures ONLY with a low
voltage
landscape
transformer reduces the voltage from 120V to
12V, making it safe and suitable for outdoor use.
When installing the fixture(s), please follow
these instructions carefully:
1.Before
installation,
the power is turned off for your safety.
2. To attain entry to the fixture, we recommend
carefully removing the screws that are currently
securing it in place. This will allow you to
effectively access and address any necessary
adjustments that may be required.
3. Acquire the enclosed LED strip light from the
packaging. Proceed by peeling off the adhesive
backing from the strip, then meticulously affix it
to the surface of the fixture. Please ensure that
during the application process, the strip is
precisely
aligned
to
positioning.
4.Hold the FIXTURE against the wall at the
desired height and orientation. Ensure it is level
and aligned according to your preferences.
5.Using a pencil or marker, carefully mark the
screw hole locations on the wall through the
holes in the metal plate.
6.Select an appropriately sized drill bit for the
pilot holes, which should match the diameter of
the screws you are using. It is recommended to
use a bit slightly smaller than the screws to
provide a secure grip.
CAUTION:
INSTALLATION INSTRUCTION
transformer.
This
please
ensure
that
achieve
a
centered
www.ABBALightingUSA.com
7. Position the drill bit on each marked spot and
gently drill pilot holes into the wall at the marked
locations. Take care not to drill too deep, ensuring
the depth matches the length of the screws.
8.For concrete installation, To begin, construct
conduit raceways inside the concrete formwork by
using one-inch dowels and PVC pipe before
pouring the concrete. After the concrete has
cured, remove the dowels and proceed to finish
the outer surface of each riser if you are installing
it in stairs.
We recommend using WN12 waterproof wire nuts
(sold separately) for optimal connectivity.
9.Strip the insulation: Carefully strip approximately
3/4 inch (1.9 cm) of insulation from the ends of the
two wires you wish to connect. Ensure that the bare
metal ends are clean and free from any frayed
strands.
10. Align the wires: Hold the stripped ends of the
two wires together, aligning them neatly and
ensuring that no stray strands are crossing over.
11. Insert the aligned ends of the wires into the wire
nut, ensuring that they go all the way in. The bare
ends should be completely covered by the wire
nut. Twist the wire nut: Firmly twist the wire nut
clockwise onto the wires, ensuring a secure
connection. Continue twisting until the wire nut is
tight
and
snug.
For
recommended to apply electrical tape around the
wire nuts and wires as an extra layer of protection.
12.Test the connection: Gently tug on each wire to
ensure they are securely held by the wire nut.
added
safety,
it
is