Before Start-Up
3) Check that the conveyor run is level & straight.
Use surveyor's line (string) to check straightness.
4) Tighten all connector plates and oor
supports. Lag supports to oor using 3/8" lags.
5) Check lubrication as noted in the Lubrication
Section.
6) Install electrical controls. Note voltage and
phase of motor. Wiring and controls shall
conform to National Electric Code and any appli-
cable OSHA re quirements.
7) After power supply has been connected
make sure all power has been disconnected and
locked out according to OSHA guidelines when
further adjustments or maintenance is required.
12
Antes de puesta en marcha
3) Comprobar que la carrera transportadora está
nivelada y recta. Utilice la línea de agrimensor
(cadena) para comprobar la rectitud .
4) Apriete todas las placas de conexión y
soportes de piso. Lag apoya al piso usando 3/8 "
rezagos.
5) Comprobar la lubricación como se señala en
la sección de lubricación .
6) Instale los controles eléctricos . Nota tensión
y fase del motor. Cableado y controles deben
cumplir con el Código Eléctrico Nacional y todos
los requisitos aplicables de la OSHA .
7) Después de la fuente de alimentación se ha
conectado asegurarse de que todo el poder
se ha desconectado y bloqueado según las
directrices de la OSHA cuando se requiere más
ajustes o mantenimiento.