Ambirad Vision VSOUT Panduan Perakitan & Instruksi - Halaman 13

Jelajahi secara online atau unduh pdf Panduan Perakitan & Instruksi untuk Pemanas Ambirad Vision VSOUT. Ambirad Vision VSOUT 20 halaman. Radiant tube heaters

2.2.10 End Caps
Remove the protective plastic coating.
Position the end cap with no tube holes (M)
beneath the reflector profile at the U bend end
making sure that the end cap engages inside
the inner reflector . Fasten to canopy using M5
pozi set pin and washers.
Position the end cap with tube holes beneath
the reflector profile at the burner end making
sure that the end cap engages inside the inner
reflector . Fasten to canopy using M5 pozi set
pin and washers.
2.2.11 Burner Assembly.
Slide the burner assembly (F) onto the RIGHT
HAND
TUBE
when viewed from behind,
ensuring it is fully engaged. Secure with grub
screws.
2.2.12 Heat Exchanger Assembly
On VSXO only, slide the heat exchanger
assembly (E1) onto the LEFT HAND TUBE
when viewed from behind ensuring it is fully
engaged. Secure with pinch screws.
2.2.13 Fan Assembly
On unitary heaters only, slide the fan
assembly (E2) onto the LEFT HAND TUBE
with the test point closest to the tube when
viewed from behind ensuring it is fully engaged.
Secure with pinch screws.
2.2.14 Herringbone Damper Assembly
On Herringbone heaters only, slide the
damper assembly (E3) onto the LEFT HAND
TUBE with the test point closest to the tube
when viewed from behind ensuring it is fully
engaged. Secure with pinch screws.
Note: The damper assembly must be located
with its damper blade vertical and left in the
closed position. The manifold tube is to be
sealed and secured (as described below) to the
damper assembly.
Doc No. 700021 Page 13 of 20