Aero Storm 52 Instalasi & Panduan Pengguna - Halaman 3

Jelajahi secara online atau unduh pdf Instalasi & Panduan Pengguna untuk Kipas angin Aero Storm 52. Aero Storm 52 20 halaman.

Aero Storm 52 Instalasi & Panduan Pengguna
Provide adequate clearance from the floor. The lowest point on the
fan blades must be at least 2.1m (7 feet) from floor level in Australia
and at least 2.3m from floor level in the European Union and affiliated
countries.
Make sure that the chosen location of the fan will not allow the rotating
fan blades to come into contact with any objects.
Ensure ceiling joists are sound and of adequate size and strength to
support a 25Kg (55lb) load.
To reduce the risk of fire, electrical shock or personal injury, ensure
that the fan mounting bracket is supported directly from the building
structure. DO NOT mount to an outlet box.
The mounting bracket must be firmly screwed to a load bearing structure e.g. a concrete ceiling, steel structure or
timber frame. If a timber frame is to be added it must be securely nailed or screwed between two beams.
After the fan is completely installed, check to make sure that all connections are secure to prevent the fan from falling
and/or causing damage or injury.
To reduce the risk of personal injury, do not bend or damage the motor or Fan Assembly when handling or during
installation.
Please ensure special care is taken when assembling the fan. Each screw must be sufficiently tightened.
Installing extension rod (optional accessory)..............................
Installing hanger bracket..........................................................
Installing fan - without LED light..............................................
Installing fan - with LED light....................................................
Fan remote control reprogramming..............................................
Operating the fan from the remote control.................................
Replacing LED Panel if required................................................
Summer and Winter Mode Explained.........................................
General Information.................................................................
General maintenance & cleaning...............................................
Troubleshooting............................................................ ...........
Ceiling fan warranty information................................................
Not covered by warranty...........................................................
Electrician Checklist..................................................................
National Warranty Hotline|1300 116 305
LOCATION AND INSTALLATION REQUIREMENTS

TABLE OF CONTENTS

Ceiling
Floor Level
Page 3
Page 4
Page 5
Page 6
Page 7
Page 9
Page 11
Page 11
Page 12
Page 13
Page 14
Page 14
Page 15
Page 16
Page 17
Page 17
Page 18
Monday to Friday 9am to 5pm AEST
minimum
2100mm
2