Air Knight Air Knight IPG Panduan Pemilik - Halaman 5
Jelajahi secara online atau unduh pdf Panduan Pemilik untuk Pembersih Udara Air Knight Air Knight IPG. Air Knight Air Knight IPG 16 halaman. Air purification system

INSTALLATION
RECOMMENDED INSTALLATION TOOLS
•
4" Hole Saw (metal specific recommended)
•
Drill/Power Driver
•
Phillips Screwdriver
•
3/8" Drill Bit (for fiberglass ductwork)
•
1/4" Nut Driver Bit
YOU MAY ALSO NEED:
•
Utility Knife or Duct Knife
•
Tin Snips (for metal ductwork)
INSTALLATION REQUIREMENTS
1.
Unit should be installed in the supply side air stream of the HVAC system.
2.
An approximate 4" (8.89 cm) opening will need to be cut into the
existing duct work to install the unit properly.
Airflow Orientation
Be sure to orient the unit for proper airflow through
the IPG core in either horizontal or vertical air flow
systems. Air should be able to freely flow through the
IPG core as shown.
It is recommended that the Fan Setting on your
thermostat be set to ON to ensure continuous air
flow through the IPG core.
REMOVE AIRFLOW TAG BEFORE INSTALLATION
Hardwiring Requirements
Connect black and white wires to a dedicated 40Va transformer.
Electrical wiring of the unit to the HVAC system should be done by a
licensed HVAC installer or electrical contractor.
(Tools & Requirements)
5