Apollo Smoke Detector XP95 Panduan Instalasi - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Sistem Keamanan Apollo Smoke Detector XP95. Apollo Smoke Detector XP95 18 halaman. Input/output unit
Juga untuk Apollo Smoke Detector XP95: Panduan Pemasangan & Pemeliharaan (4 halaman), Panduan Instalasi (2 halaman), Manual Instalasi (2 halaman), Panduan Instalasi (2 halaman), Panduan Memulai Cepat (2 halaman), Panduan Memulai Cepat (5 halaman), Panduan Instalasi (2 halaman)

Apollo Smoke Detector XP95 Panduan Instalasi
No
de
Op
64
I
OFF
ON
Tx
Plug
Tx
Tx
Rx
www.acornfiresecurity.com
Step by step guide to aligning and calibrating
1. Check that the cables at the interface (Fig 4 on page 6) are correctly con-
nected and switch the interface to alignment mode.
2. Power up the beam detector.
3. After fi tting the transmitter and receiver as described in point 3 on page
8, loosen the transmitter so that it can be moved with slight resistance up,
down, left and right.
4. Remove the plug on the transmitter.
5. Using a 0 point cross-head or terminal screwdriver turn the potentiometer
fully anti-clockwise. This adjusts the transmitter power to maximum.
6. The transmitter must be correctly targeted at the receiver by a combination
of movements, up and down, right and left until the centre of the beam hits
the centre of the receiver.
11
www.acornfiresecurity.com