Austria Email VT-S 1000-FFM Panduan Petunjuk Pengoperasian dan Pemasangan - Halaman 8
Jelajahi secara online atau unduh pdf Panduan Petunjuk Pengoperasian dan Pemasangan untuk Ketel uap Austria Email VT-S 1000-FFM. Austria Email VT-S 1000-FFM 16 halaman. Pressure-proof large storage tank
A maintenance-free external current anode (accessory) may be installed as follows at the 3/4" coupling
sleeve and at approx. half the boiler height using a reduction union piece at the front.
Installation of external current anode
1 Electronic pulse generator
2 Mains cable
3 Anode connecting cable
4
Anode carrier plug
5 Attachment for spanner
6 Cable connector for ground circuit
Remove screw plug (12). Apply sealing paste to the thread of the external current anode (4) before
screwing in. Screw Correx external current anode (8) into the 3/4" coupling sleeve (13) using a 1/2"
reduction union piece. Connect connecting cable (3) from casing (1) to the external current anode (7)
using a flat plug connection.
Caution: Connect ground cable (6) to grounding clip (15) using screw M6 (14).
8.3 Series VT-S FRM and FRMR
The enamelled boiler of the series VT-S FRM & FRMR is protected by a standard external current
anode.
Id.Nr.: 233754-4
7 Cable connector for anode circuit
8 Anode
9 Operating display – LED
10 Assembly loops
11 Ring for ground circuit
8