AFG 13.0AT Panduan Pengguna - Halaman 6
Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Treadmill AFG 13.0AT. AFG 13.0AT 19 halaman.
Juga untuk AFG 13.0AT: Panduan Pengguna (20 halaman)
AS SE MB LY ST EP 3
WHITE HARDWARE BAG CONTENTS :
SCREW (G)
15 mm
Qty: 4
SPRING WASHER (I)
8.2 mm DIAMETER
Qty: 2
SCREW (G)
HAND RAIL SLEEVE
HAND RAIL
SPRING WASHER (I)
BOLT (H)
WASHER (J)
10
13.0AT_Rev.1.7.indd 10-11
A Open WHITE HARDWARE BAG.
B Slide HAND RAIL SLEEVE over
BOLT (H)
30 mm
the top of the hand rail.
Qty: 2
C Attach top of HAND RAIL to
WASHER (J)
the console extension using 2
8.2 mm DIAMETER
Qty: 2
SCREWS (G)*.
D Attach bottom of HAND RAIL to
the base frame using 1 BOLT
(H), 1 SPRING WASHER (I) and
1 WASHER (j).
E Slide HAND RAIL SLEEVE firmly
against console.
F Repeat on other side.
* NOTE: During handlebar
assembly, ensure that ALL
screws and bolts are in place
and partially threaded in
before completely tightening
any ONE screw or bolt.
ASSEMBLY STEP
ORANGE HARDWARE BAG CONTENTS :
SCREW (K)
30 mm
Qty: 4
HAND RAIL BASE COVER
SCREW (K)
YOU'RE FINISHED!
A Open ORANGE HARDWARE BAG.
B Attach HAND RAIL BASE COVER to
the base frame using
2 SCREWS (K).
C Repeat on other side.
D Be sure all bolts and screws are
tightened and secured on the
treadmill.
11
4/1/08 3:41:05 PM